Skip to main content

Tool 5.3: Checklist

The following checklist is intended to help anticipate the expected increased role of the sub-national levels in the implementation of the plan or strategy.

  • 1
    Current Analysis
  • 2
    Policy formulation
  • 3
    Policy costing
  • 4
    Action plan and implementation arrangements
  • 5
    Monitoring and evaluation
  • 6
    Complete
Analysis
1.1 Have actors at the subnational level been involved in the situation and problem analysis?
1.2 Does the situation analysis include an institutional capacity analysis that includes the subnational level?
1.3 Does the situation analysis include subnational actors mapping/analysis?

Download the tool

Tool 5.3 - Checklist - Subnational Implementation of the Plan (PDF)
Tool 5.3 - Checklist - Subnational Implementation of the Plan (Docx)